Substantial Velocity Exported Energy Preserving Cantilever Wire Twist Machine
Video hyperlink on Youtube: EPchannel/UCrRUG2MnVoi8rfQ6FK2vYow
The specs of the bow variety bunching machine
Equipment kind | CZPT -φ1250D |
Wire item of stand | Particular use twist aluminum and copper round press dowm the conductor |
Cooper wire person | Φ1.five-four.8 |
Complete standed wire/max. | ten mm φ/max |
Complete standed wire/Max. | 15mm φ/max |
Segment of strand-twisting(Flexible strand) | 3.5÷70mm2(6AWG÷450MCM) |
Area of strand-twisting(Semi-frametwisting1+6) | three.5÷50mm2(6÷1/0AWG) |
Part of compaction Cu | three.5÷50mm2(6AWG÷300MCM) |
Area of compaction Al | three.5÷70mm2(6AWG÷301MCM) |
Line speed/Max. | 150mpm/max |
Stand pitch(mm) | 40-350mm |
sixty | 8000rpm/max.(1600TPM) |
Load excess weight/Max. | 3000KG |
Max.compaction angle | 13% |
Traction pulley | 2×φ600mm |
Standing Path | S,Z Route |
Principal motor(DC/AC/HP) | 55kw D.C. motor |
Push of Capstan(DC/AC/HP) | 30kw D.C. motor |
Generate of consider-up unit(DC/AC/HP) | seven.5kw D.C. motor |
Drive of traverser | .75kw Inverter motor |
Push of liading&unloading | one.5kw Inverter motor |
Electricity management | Digital kind DC manage |
Revise program | Line speed synchronous vehicle control |
Spool bobbin dimension OD | OD:φ1250 mm/Max |
Spooler dimension OW | 950×800×80(mm) |
Management technique | PLC guy-device interface |
Tension handle | Coiling motor indicates rigidity handle |
Lay stranding pitch | PLC digitization location |
Operating direction | Remaining/ appropriate hand device |
Traversing width | 1000mm/Max |
Traversing device | Wire diameter setting by electronic variety |
Consider-up variety | Reel taken among pneumatic pintles |
Reel loading & unloading | Liquefaction computerized positioning |
Brake method | Disc brake |
CZPT lubricative sort | Oiling regularly |
Air stress | 6kg/cm2 |
Vogtage | 380V 50Hz |
Sound amount | 80db |
Machine measurement | (L)6030×(W)2280×(H)2280mm |
Bodyweight | 12500kg |
Professional and Powerful Manufacture and Sales Team
Crew of CZPT service | |||||
Name | education | Situation | Primarily responsible for venture | Specializing in project | Sector operating history ( year ) |
zHangCZPT Xie | school | CZPT Engineer | The total venture design and style and plHangCZPT | electrical power cable equipment | 15 |
xioahua Hu | school | Vis common engineer | The overall task design and style and plHangCZPT | net cable,knowledge cable machine | 10 |
Chnaghong Cheng | higher education | Engineer | Drawings and following-sales support | Teflon,Optical fiber cable device | twenty five |
xiuwu Chen | school | CZPT Engineer | The overall project design and plHangCZPT | copper drawing device | fifteen |
lixin Yuan | school | Engineer | The project style and plHangCZPT | coppwer wire making technological | sixteen |
zhenghai Qiu | university | cable engineer | Right after services | cable producing and cable manufacturing unit management servie | fifteen |
jinxin Liu | college | Advertising and marketing engineer | Right after provider | electrical engineer | seven |
xingguo Tang | Higher school | CZPTal engineer | Right after services | electrical engineer | 10 |
changqiang Li | Large school | Preserve engineer | After support | machina keep and install service | ten |
haipin Li | University | CZPT director | Advertising and marketing and sales | task consulting | 8 |
sen Yang | University | CZPT translator | Marketing and income | task consulting | 5 |
CZPT CZPT Components Makes
Motor: HangCZPT Motor , Teco, ABB, Siemens
Inverter : Japan Yaskawa, Siemens, ZheJiang Teco
Temperature Handle Meter: Japan RKC
Auxiliary Relay: Japan Omron
Ammeter and Voltmeter: ZheJiang Risesun
Indicator, Swap and Button: ZheJiang Are likely
Contactor: ZheJiang Shihlin
Line Pace Meter: ZheJiang FOTEK/Xihu (West Lake) Dis.
CZPT : NSK, SKF
Following support
1).Supply dates: forty five times
two).Payment: TT or L/C
3).Packing: Wooden packing and PE plastic packing make certain the merchandise basic safety on the transportation.
four). Install and training service: 2 professional engineers who has more than 5 years overseas install and cable manufacture training knowledge.
five). Following service phone amount on-line
Contact information
Web site:
Include: No. 38, Houhu Highway, Humen City, HangCZPT CZPT, ZheJiang Province, China
In which are we
Hongkong airport to Humen by boat 2 hours
HangCZPT airport to Humen by auto 2 hours
HangCZPT airport to Humen by vehicle 1 hour
HangCZPT South large pace practice station to Humen 20 minutes
HangCZPT North substantial velocity prepare station to Humen twenty minutes
Topic
1250 CZPT Twist Buncher
But device must be developed to previous up to 5,000Kgs.
A. Supply scope and Specification:
one. Line composed of:
1 ) 800 (630) mm pay-off: 800 (630) mm x 10 CZPT motorized pay-off
two) Collective foundation
three) CZPTal Manage Box
four) 1250 mm CZPT Twist Device Primary entire body
2. Specification of Principal physique:
1) Final software:
Bunching of Bare copper wire, Stranding of Insulated cable
two) Inlet dimensions:
– Bare Cu. Wire .5 – 1 .5 mm dia.
– Insulated main cable 1. – 8. mm dia.
three) Finished dimension after bunching & Stranding:
– Bare Cu. Wire 7. mm dia.
– Insulated core cable 20. mm dia.
But this equipment should produce bare copper wire stranded as concluded solution
up to 35 mm sq.
4-1 ) Lay pitch: 30 – 250 mm, Pitch selection: fifty mm to 250 mm at every ten mm interval
EHI will offer the provider with knowledge sheet for all pitches
four-two) Pitch shifting system: by Digital pitch changing technique
five) Traversing:
40 mm Rolling rod (German) + traversing unit (Tian Xiang) but within CZPT outfitted
with NSK CZPTs
6) Line speed:
Max. seven hundred rpm, Velocity controlled by Inverter
seven) Standing & Bunching Course:
S or Z direction, Route by handbook swap
eight) Bobbin Elevate Up and Down: By Oil (CZPT) lifter with 5 HP AC motor
nine) Just take-up bobbin: 1250 mm. As for every the attached drawing
Max. weight of take-up bobbin (entirely wound): 4,000Kgs
one ) Motor:
Main body: 50 HP AC Motor (TECO) + 50 HP Inverter(YASKAWA)
1 1 ) Duration counter: ZheJiang TOFEK PM12-04N Sensor, 5 digit, Accuracy +/- .three%
12) Supply Power: 380 Volt., 60Hz, 3 Phase
13) Emergency quit for protection:
When doorway opened. When CZPTr is not found in the correct positions
one 4) Automatic stop:
Cable damaged, Cable attained to preset size
one five) Detecting system for Broken conclude: to be mounted
Its location: 1 inside + 1 exterior
16) Major control panel:
Mitsubishi Touch monitor & Mitsubishi PLC
1 seven) HDI: Electronic screen for Rotational speed, Line velocity, Length counter, Operating hours,
Alarm failure indicator
18) Metal plate for Major frame
eighteen-one) St. plate Quality: to be specified
18-two) St. plate Thickness:
– Thickness of Bottom steel plate base: mm T.
– Thickness of Wall facet: mm T.
The provider promise unacceptably extreme Vibration (this extreme vibration will effect
straight lifestyle-time of machine following prolonged-phrase use) will not come about.
19) Primary CZPT & Cooling method for main bearing:
19-one) CZPT manufacturer: NSK
19-two) Cooling technique: Automobile. Grease Feeding Program (complete 2 sets)
twenty) Cooling system inside DTB: Higher speed 4 Fans
twenty-1) Ability of Supporter motor: 1 HP/admirer
20-two) Air OUT from DTB: 4 Positions at Best side by 1 HP at every placement
20-three) Air IN to DTB: 2 Positions at Again-wall facet but no fans
21) Stress management: twenty Kg Powder Clutch (ZheJiang )
22) Emergency Brake:
22-one) Inside by Electromagnetic brake (Model identify and its specification to be specified)
22-2) Outside the house by Disk type brake (ZheJiang brand, its specification to be specified)
23) CZPT Bow: Carbon fiber bow kind
24) Warmth-treatment method:
Heat-treatment ought to be completed for all steel moving areas & components
twenty five) CZPTs to be utilised at other locations: NSK and NACHI
26) Dimension: mm L. x mm W. x mm H.
27) Tension ON/OFF: to be equipped
28) Size of Capstan inside primary human body: mm dia.
The provider assure no hurt to cable top quality (insulated completed cable 35 mm sq.)
by bending severely even on the a.m. capstan measurement
29) Noise stage: Underneath eighty five dB
thirty) Lubricating technique for inside of Main shaft: to be situated Outdoors but manual grease feeding