SAE 1020 Cold Drawn Seamless Rectangular Steel Tubing

SAE 1020 Cold Drawn Seamless Rectangular Steel Tubing

Part I&colon Solution INTRODUCTION
one&time period Description&colon 
Seamless rectanglar metal tubes&comma with the other identify rectangular hollow area&comma is created from sizzling rolled seamless steel pipes&period It’s not welded hollow segment&interval It is made via hydraulic cold drawing and is seamless tube with tight measurement tolerance&comma excellent twist&commaetc&period 

two&period of time Commodity&colon SAE 1571 cold drawn seamless rectangular metal tubing

three&interval Accessible metal gardes&colon

ASTM A519&colon SAE1571&commaSAE1026&commaSAE1045&commaSAE1518&commaSAE1524&commaSAE1541&comma SAE4130&commaSAE4140&commaSAE4145&commaSAE4340&commaSAE8620
DIN 2391-2&colon ST35&commaST45&commaST52
EN 10305-1&colon E195&commaE235&commaE355&commaC35E&commaC45E&comma25CrMo4&comma34CrMo4&comma42CrMo4&comma
EN 10305-four&colon E215&commaE235&commaE355
GB&solT 3639&colon 10&num&comma20&num&comma45&num&comma16Mn&commaQ345B&commaQ345C&commaQ345D&commaQ345E&comma25Mn&comma27SiMn&comma

5&period of time Measurement selection&colon

Side 80mm&ast60mm-300mm&ast200mm
W&periodT&colon 35mm max

6&time period Manufacture strategy&colon CZPT cold drawn

seven&time period Shipping and delivery Condition&colon

BKW BKS GBK NBK
&plusLC &plusSR &plusA &plusN
Chilly drawn Pressure relieved Annealed Normalized

eight&period of time End end&colon plain ends with sq. cuts&commabevelled ends&interval

9&period CZPT export packing&colon in bundles tied with steel strips&time period Inner and external oil coating&period External packing by PVC bags and knit luggage&interval

ten&period of time CZPTized packing or marking are CZPT upon request&period of time

Chilly DRAWN SEAMLESS RECTANGULAR TUBE – NOT Warmth Treated&colon

Chilly DRAWN SEAMLESS RECTANGULAR TUBE – Stress RELIEVED&colon

Chilly DRAWN RECTANGULAR TUBE – Heat Handled&colon

 

Component II&colon Regularly Asked Inquiries
1&period MOQ&colon 
5 tons&solsize dependent on the dimension&period
two&interval Delivery Time&colon 30-forty five days regular&interval
three&period Warranty&Guarantee&colon Warranty&promise time period is 6 months because we supply the tubes&comma and we are not dependable for top quality difficulty triggered by mistaken unloading or storage following shipment&interval We welcome customer’s inspection ahead of shipment&period 
4&period of time Payment Approach&colon We acknowledge payment strategy like T&solT&comma L&solC&comma or D&solP&comma but it relies upon on our investigation about clients&period We have a solution to consider the credit score of clients from all in excess of the planet&comma and time and volume of D&solP we can launch is identified by the evaluation&period 
5&period of time Top quality Manage&colon We purchase uncooked content from steady suppliers who are leading steel mills&comma and we examine the raw materials as per the specifications&time period For the duration of our generation treatment&comma there is inspection and good quality manage in every single phase&interval

Component III&colon Business INTRODUCTION
We are a manufacturer of cold drawn&comma chilly rolled&comma and hydraulic chilly drawn steel tubes with OD upto 356mm since 2002&time period Masking an spot of about 32000M2&comma we have 12 common workshops with  two hydraulic cold drawing benches&comma four chain cold drawing benches&comma and 2 ERW mills&time period Our facilities addresses all the production processes from pickling&comma chilly drawing&commaheat treating&commasaw cutting&comma straightening&commainspection&commapacking to additional machining &turning&comma cold drawing die fabrication&comma and gear repairation&routine maintenance&interval

Factory Visual appeal&colon

Uncooked Material Inventory&colon

HYDRAULIC Chilly DRAWING&colon

STRAIGHTENING&colon

Saw Slicing&colon

Warmth Dealing with FURNACE&colon

 

SAE 1020 Cold Drawn Seamless Rectangular Steel Tubing

Tags: